How to price a job
To price a job, add up five parts: the hours times your hourly cost, materials with a markup, travel and small costs, a contingency for surprises, and your profit. VAT goes on top of that total. The most common mistake is using what you’d like to earn as your hourly rate, without counting the hours nobody pays for. With Clara, the price the client accepts is logged as an agreement.
Skip the manual chasing: Clara reads your work chats, voice notes and photos, and lines up tasks, quotes and payments every morning. Free to start.Start free
Step by step
Work out your hourly cost: what you want to earn in a year plus your fixed costs (vehicle, insurance, tools, phone, accountant, fees), divided by the hours you actually bill. The hourly rate calculator does it for you.
Estimate the job’s hours by stage (prep, the work itself, finishing, clean-up) and add some slack if you haven’t done one like it before.
Cost the materials at what you pay and add a markup: your time to buy, carry and stand behind them costs money too.
Add travel, parking, waste removal and the small consumables that always get forgotten.
Add a contingency for surprises: between 5% and 15% depending on how uncertain the job is.
Add the business’s profit, which is separate from your wage: it’s what lets you invest, cover a slow month or a client who doesn’t pay.
Compare the result with your local market and decide whether to round, adjust or explain it better.
Add the VAT that applies and state on the quote whether the price includes it.
Example: painting a 90 m² flat (walls and ceilings)
| Item | Working | Amount |
|---|---|---|
| Hourly cost | (€30,000 you want to earn + €9,000 costs) ÷ 1,265 billable hours | ≈ €31/h, rounded to €32/h |
| Labour | 24 hours × €32 | €768.00 |
| Materials | €260 cost + 15% | €299.00 |
| Travel | 3 days × €12 | €36.00 |
| Protection and clean-up | Sheeting, tape, waste removal | €45.00 |
| Contingency | 8% of €1,148 | €91.84 |
| Profit | 10% of €1,239.84 | €123.98 |
| Quote subtotal | Rounded | €1,365.00 |
| VAT | In this example, 21% | €286.65 |
| Total | €1,651.65 |
Where the billable hours come from
The 1,265 hours in the example come from 46 working weeks (after holidays, public holidays and a few sick days) × 5 days × 5.5 billable hours a day. Why 5.5 and not 8? Because part of your day nobody pays for: writing quotes, buying materials, answering WhatsApp, invoicing, driving between jobs. Divide by 2,000 hours instead of 1,265 and your hourly rate comes out 37% lower than you need.
How to present the price to the client
The working is for you; don’t show the client your margin or your contingency. Show them what they get: each item with a clear description (wall preparation, two coats of paint, protection and clean-up), the total, and whether VAT is included. A price broken down by work rather than by cost gets haggled less and compared better.
If the client asks for a discount, don’t just cut the price: take something out of the job (a room, a finish) or change a material. That way the price still matches what you do.
Margin and markup are not the same
| Margin on the final price | Markup needed on cost | Cost €100 → price |
|---|---|---|
| 10% | 11.1% | €111.11 |
| 20% | 25% | €125.00 |
| 25% | 33.3% | €133.33 |
| 30% | 42.9% | €142.86 |
| 40% | 66.7% | €166.67 |
Five ways to set a price, and when to use each
- Hourly: when you don’t know how long it will take (repairs, maintenance). Give an estimate and warn if it runs over.
- Fixed price: when you know the job well. It reassures the client; the risk of overrunning is yours.
- Per unit (m², socket, session): quick to work out and easy to compare, but check the jobs that aren’t typical.
- By stage: on long jobs, bill each stage as it’s done and cut the risk of not being paid.
- Minimum call-out: for small jobs that don’t cover the trip.
Mistakes that lose money
- Passing materials on at cost.
- Not charging for the visit on quotes that take a lot of survey work.
- Forgetting VAT, or not saying whether the price includes it.
- Giving a price on WhatsApp from memory and never putting it in writing.
- No expiry date: materials go up and your price doesn’t.
Where Clara saves the work
Working out the price is your job; what Clara does is make sure it isn’t lost afterwards. When a client accepts in the chat, Clara logs the agreement with the figure and the exact words, and if a week passes without asking for the money, you see it under “Accepted, not billed”. If the client goes quiet, on Max Clara drafts two reminders for the quote; more ideas in how to follow up on a quote.
On Max, Clara also drafts the quote from what you discussed and your price list, and leaves blank any price it can’t find so you fill it in (quotes from WhatsApp). Without Max, there’s the free quote generator and the VAT calculator.
Frequent questions
What profit margin should I put on a job?
There’s no single number: it depends on your trade, your risk and your area. What matters is that it exists and is kept separate from your wage and the contingency.
Should I charge travel separately or build it into the price?
Both work. Separately is clearer on small jobs; built in looks tidier on big ones. What doesn’t work is not charging for it.
Should I charge for writing a quote?
Not usually for simple jobs. If it needs site visits, measuring or design work, it’s reasonable to charge and deduct it if the client goes ahead.
How do I price a job I’ve never done before?
Break it into tasks you do know, estimate each, and raise the contingency. If you can’t estimate it, charge hourly with an indicative cap.
What if my price comes out higher than competitors’?
First check your billable hours are realistic. If they are, explain what your price includes (guarantee, clean-up, materials) rather than simply cutting it.
Does Clara work out the price for me?
No. On Max, Clara takes prices from your list and from what was said in the chat; deciding what to charge is up to you.
How often should I review my prices?
At least once a year, and whenever your materials, vehicle or fixed costs go up. If you haven’t touched them in a while, check your real billable hours too.
Try Clara on your own chats
Free to start, no card needed. Clara only reads: it never sends a message on its own.
Start free