Skip to content

Building work quote template

A building work quote is made of measured items: each job with its unit (m², linear metre or unit), its quantity and its price, plus waste removal. Below is Clara’s free quote generator, already filled in with a new partition wall and re-tiling a 12 m² terrace with waterproofing. Change the measurements and prices to your job and download the PDF.

Send quotes faster without rereading long chats: on Max, Clara drafts the quote from the conversation and your price list. Start free with no card.Start free

Your details
Client
Items
Subtotal
€1,995.00
VAT
€399.00
Total
€2,394.00

Nothing you type is stored: the PDF is made and handed to you.

The prices are examples

The figures in the generator show how a small building job is set out; they are not a price book. Use your own: your price per m² of wall, plastering or tiling depends on what materials cost you, site access and your team’s output. Always measure on site before giving a firm total.

What a building work quote must include

  • Both parties’ details, the site address, a quote number and date.
  • Each item with description, unit of measurement, quantity and unit price.
  • Whether materials are included, and what type (brick, plasterboard, porcelain).
  • Preparatory work: breaking out, demolition, preparing the base.
  • Waste removal, in bags or a skip.
  • How the price adjusts if the final measurement changes.
  • Duration, payment schedule, validity and exclusions (decorating, electrics, permits).

Each line of the example, explained

ItemWhat it coversHow to price it
Partition wallBuilding the wall, materials included.Per m² of wall.
PlasteringPlaster on both faces, ready to paint.Per m² of surface (both faces).
Breaking outLifting the old terrace floor.Per m².
Screed to fallsA mortar base that carries water to the drain.Per m².
WaterproofingMembrane with overlaps, turned up the walls.Per m², counting upstands.
Floor tilingNon-slip porcelain and laying.Per m².
SkirtingCeramic skirting round the edge.Per linear metre.
WasteBags taken to a licensed tip.Per bag or per skip.

How to send it on WhatsApp

  1. Measure on site, adjust quantities and prices and download the PDF.

  2. Attach it as a Document in the chat with the total and timing: “Here’s the quote for the wall and terrace: €2,394 including VAT, about 7 days.” More wordings in the message to send a quote.

  3. Explain the payment on starting, which covers materials; how to ask for a deposit gives examples.

  4. Ask for acceptance in writing in the same chat and keep the message.

  5. If measurements change during the job, send the corrected lines before you invoice.

Common mistakes in building quotes

  • A lump-sum price with no items or measurements.
  • Forgetting the plastering after the wall, or counting only one face.
  • Leaving out waterproofing on terraces and wet rooms.
  • Not including waste removal, which the client assumes is covered.
  • Not saying how the price adjusts if the final measurement differs.

When the work is requested on WhatsApp

Clients send photos, rough measurements and voice notes with what they want. Clara reads those chats and logs the jobs and agreements with their messages; on Max it also drafts the quote from the conversation and your prices per m². You check it and send it yourself. More on the page for builders and in the renovation template.

Frequent questions

How is a partition wall measured for a quote?

Length by height, in m², deducting large openings for doors or windows. Plastering is measured separately, on both faces.

Should waste removal be on a building work quote?

Yes, as its own item, in bags or a skip. It is the first thing the client asks about when they see the finished job.

What if the final measurement doesn’t match the quote?

Note that the price adjusts to the real measurement at the same rate per m². Send the corrected lines before the invoice.

Do I quote labour and materials separately on building work?

A price per m² with materials included is common and easier to compare. If the client supplies materials, charge only for fitting.

Does terrace waterproofing need to be on the quote?

If you are re-tiling a terrace it is the prudent thing to do, and it is best as its own item so the client sees why it isn’t skipped.

Can I use this template to quote for a plasterboard wall?

Yes: swap the brick wall for a plasterboard partition, with the stud frame, insulation and jointing on their own lines.

Try Clara on your own chats

Free to start, no card needed. Clara only reads: it never sends a message on its own.

Start free