Skip to content

Renovation quote template

A renovation quote is built from line items in the order the work happens: strip-out and waste, building work, services, finishes and cleaning, each with its measurement (m², metres or units) and its price. Below is Clara’s free quote generator, already filled in with a living room and hallway renovation. Change the measurements and prices to your job and download the PDF to send.

Send quotes faster without rereading long chats: on Max, Clara drafts the quote from the conversation and your price list. Start free with no card.Start free

Your details
Client
Items
Subtotal
€5,436.00
VAT
€1,087.20
Total
€6,523.20

Nothing you type is stored: the PDF is made and handed to you.

The prices are examples

The figures in the generator show how a renovation quote is laid out; they are not reference prices. Every job changes with the state of the property, the materials the client picks and what your trades cost you. Measure it yourself, enter your prices per m² and per unit, and check the total before you send it.

What a renovation quote must include

  • Both parties’ details, the property address, a quote number and date.
  • Line items in the order of the work, each with its unit (m², metres, units) and quantity.
  • Specific materials: type of flooring, door model, paint quality; or “client’s choice up to X per m²”.
  • Waste removal and the skip, which are easy to forget.
  • A contingency line, and a note that it is only charged if used.
  • How long the work will take and a staged payment schedule.
  • What is excluded (furniture, appliances, permits the client arranges) and how changes get approved.

Each line of the example, explained

ItemWhat it coversHow to price it
Lifting the floorRemoving the old floor and taking the waste out.Per m².
SkipSkip hire and the permit to place it on the street.Fixed price per skip.
Screed and levellingA flat base for the new floor.Per m².
Laminate flooringMaterial, laying and skirting.Per m² of floor.
Internal doorsDoor, frame, ironmongery and fitting.Per unit.
Light and socket pointsEach new point with its cabling.Per unit.
Skimming and paintingPreparing walls and ceilings and two coats.Per m² of painted surface.
Final cleanLeaving the home ready to move back in.Fixed price.
ContingencyWhat turns up once things are opened: pipes, damp, joists.Provisional sum, accounted for.

How to send it on WhatsApp and close it

  1. Download the PDF and attach it in the client’s chat as a Document.

  2. Sum up the total, the duration and the first payment in one message: “Here’s the quote: €6,523.20 including VAT, about 3 weeks, 30% on starting.” More examples in the message to send a quote.

  3. Offer to go through it item by item on the phone: renovation quotes nearly always raise questions.

  4. When they accept, ask them to confirm in writing in the chat and keep that message; how to keep a WhatsApp agreement explains how.

  5. Send every mid-job change as a new line with its price, and wait for their “yes” before doing it.

Common mistakes in renovation quotes

  • One lump-sum “full renovation” price with no line items: impossible to compare or trim.
  • Measuring by eye: a 10% error in square metres eats the margin on the whole job.
  • No contingency, then asking for extra money halfway through without having warned anyone.
  • Accepting verbal changes that nobody later remembers asking for.
  • No payment schedule, so you fund the whole job until the end.

When the job is run over WhatsApp

On a renovation the client asks for changes in voice notes, sends tile photos and confirms things at eleven at night. Clara reads those chats and logs each agreement with the original message; on Max it also drafts the quote from the conversation and your prices. You check it and send it yourself. See the page for renovation contractors and the bathroom renovation template.

Frequent questions

In what order should the line items of a renovation quote go?

In the order the work is done: strip-out, building work, services, finishes and cleaning. The client then reads the quote the same way they will see the job progress.

Is it fair to include a contingency line in a renovation quote?

Yes, if you say what it covers and that it is only charged if used, with an explanation. It is more honest than padding every line a little.

What payment schedule should a renovation quote have?

Staged payments are usual: a share on starting, another halfway and the rest on completion. Write it in the notes so it is on record.

How do I quote for materials the client hasn’t chosen yet?

Give an allowance per m² or per unit and say the difference is adjusted if they pick something dearer. The total then doesn’t hang on a pending decision.

How do I price a change requested halfway through the job?

As a new line or a separate quote with its price, sent on WhatsApp. Don’t start it until they confirm in writing.

How many lines can the generator hold for a large renovation?

Up to 60 items. If your job has more, group small items from the same stage into one line.

Try Clara on your own chats

Free to start, no card needed. Clara only reads: it never sends a message on its own.

Start free