Skip to content

Bathroom renovation quote template

A bathroom renovation quote is split into items the client recognises: strip-out, plumbing, electrics, shower tray and screen, wall tiling, flooring, sanitaryware and taps, each with its measurement and price. Below is Clara’s free quote generator, already filled in with a 5 m² bathroom where the bath is replaced by a walk-in shower. Enter your prices and download the PDF.

Send quotes faster without rereading long chats: on Max, Clara drafts the quote from the conversation and your price list. Start free with no card.Start free

Your details
Client
Items
Subtotal
€4,801.00
VAT
€960.20
Total
€5,761.20

Nothing you type is stored: the PDF is made and handed to you.

About the example prices

These are sample prices to show a complete bathroom quote, not market rates: replace them with your own. The real price depends mostly on the tiles and sanitaryware the client picks, the state of the pipes and whether the waste has to move. If you subcontract the plumber or electrician, enter their price plus your management.

What a bathroom renovation quote must include

  • Both parties’ details, the address, a quote number, the date and the room’s measurements.
  • Strip-out with waste removal as its own line.
  • Bathroom plumbing and electrics, separate from the finishes.
  • Shower tray and screen with sizes and material.
  • Wall and floor tiling per m², saying whether tiles are included and up to what price.
  • Sanitaryware, vanity unit and taps with model or range.
  • Duration in days, days without a bathroom, payment schedule, validity and exclusions (for example, painting the ceiling or replacing the door).

Each line of the example, explained

ItemWhat it coversHow to price it
Strip-outRemoving tiles, floor, bath and sanitaryware, and taking the waste away.Fixed price per bathroom.
PlumbingNew water and waste pipes to each point.Fixed price, or per water point.
ElectricsLighting, shaver socket and extractor fan.Fixed price, or per point.
Shower trayTray, trap and levelling.Per unit, by size.
Shower screenScreen to fit the tray.Per unit.
Wall tilingTiles and fitting on the walls.Per m² of wall.
Floor tilingNon-slip floor and fitting.Per m² of floor.
Vanity and toiletSupply and fitting.Per unit or as a set.
TapsThermostatic shower mixer and basin tap.Per set.

How to send it on WhatsApp

  1. Adjust the measurements and prices, download the PDF and attach it in the chat as a Document.

  2. Write one line with the total and timing: “Here’s the bathroom quote: €5,761.20 including VAT, about 10 working days.”

  3. Add what the client needs to choose (tiles, vanity, screen) and by when, so the start isn’t held up.

  4. Ask for acceptance in writing in the same chat; if they say yes in a voice note, ask them to confirm in a message.

  5. If there is no reply within a week, follow up once with the quote follow-up message and suggest a start date.

Common mistakes in bathroom quotes

  • Not saying whether tiles are included: the client compares your price with one that leaves them out.
  • Forgetting waste removal, which is more than it looks in a bathroom.
  • Pricing the shower tray without checking where the waste is: moving it changes the plumbing.
  • Not mentioning the days without a bathroom, which is what worries most households.
  • Lumping everything into “full bathroom renovation” with no line items.

If the client asks on WhatsApp

Bathrooms are quoted from photos, measurements and voice notes. Clara reads those chats and, on Max, drafts the quote from the conversation and your prices, and tells you when the client accepts or declines it in the chat. You check and send it yourself. See also the general renovation template, the plumbing one and the message to send a quote.

Frequent questions

Should tiles be included in a bathroom renovation quote?

It is best to include them up to a price per m² and adjust if the client picks dearer ones. You give a firm total without waiting on their choice.

Is bathroom tiling priced per m² or per room?

Per m² of wall, measured: it lets the client compare and lets you adjust if the tiling stops short of the ceiling.

How many days should I quote for a small bathroom?

Give your honest estimate in working days and say the bathroom can’t be used. For a full bathroom, many tradespeople talk about one to two weeks.

What if the pipes are in poor condition once the bath comes out?

Warn about it in the notes from the start and, if it happens, send an extra line with its price before carrying on.

Is swapping a bath for a shower tray a separate item?

Yes: removing the bath, the tray, the screen and adapting the waste each go on their own lines, as in the example.

Should I take a deposit before starting a bathroom?

Asking for part up front for materials is common. Put it in the quote’s notes with the percentage and when it is due.

Try Clara on your own chats

Free to start, no card needed. Clara only reads: it never sends a message on its own.

Start free