Kitchen renovation quote template
A kitchen renovation quote works best when it separates the building work (strip-out, tiles off, plumbing and electrics) from the furniture (units per linear metre, worktop, splashback) and the fitting (extractor, appliances). Below is Clara’s free quote generator, already filled in with a 9 m² kitchen with new units and a quartz worktop. Change the measurements and prices to yours and download the PDF.
Send quotes faster without rereading long chats: on Max, Clara drafts the quote from the conversation and your price list. Start free with no card.Start free
The prices are only an example
The amounts in the generator show the format; they are not a rate card. Replace them with yours. In a kitchen the total moves mostly with the units and the worktop, which depend on your supplier and the range the client picks. If another company bills the units directly to the client, remove those lines and say so in the notes.
What a kitchen renovation quote must include
- Both parties’ details, a quote number, the date and a plan or measurements of the kitchen.
- Strip-out and waste, separate from the rest.
- Plumbing and electrics, with what moves: sink, dishwasher, oven, hob.
- Units per linear metre, with finish, handles and whether fitting is included.
- Worktop per linear metre, with material, thickness and cut-outs.
- Splashback, extractor and appliance fitting, saying who supplies what.
- Lead time for the units, days without a kitchen, staged payments, validity and exclusions.
Each line of the example, explained
| Item | What it covers | How to price it |
|---|---|---|
| Strip-out | Taking out old units and appliances and disposing of them. | Fixed price. |
| Tiles off | Removing wall tiles and clearing the waste. | Per m². |
| Plumbing | Supplies and wastes in their new positions. | Fixed price per kitchen. |
| Electrics | Oven and hob circuits, sockets and lighting. | Fixed price or per point. |
| Units | Wall and base units with fitting. | Per linear metre. |
| Worktop | Material, cuts and fitting. | Per linear metre. |
| Splashback | Covering between worktop and wall units. | Per m². |
| Extractor | Fitting and ducting. | Fixed price. |
| Appliances | Connecting and fitting those the client supplies. | Per appliance. |
How to send it on WhatsApp
Download the PDF and, if you have a sketch or render of the kitchen, send it in the same chat just before.
Attach the quote as a Document with one line: “Here’s the kitchen quote: €6,741.60 including VAT. The units take about 4 weeks from your go-ahead.”
Explain the first payment: without it you can’t order the units. How to ask for a deposit has ways to put it.
Ask for acceptance in writing and keep the message.
If the client is torn between two worktops, send a line for each option instead of redoing the whole quote.
Common mistakes in kitchen quotes
- Not saying how long the units take to arrive: the client counts from the day they accept.
- Forgetting the extractor ducting, or assuming the existing one will do.
- Not making clear who supplies the appliances and who is responsible if they don’t fit.
- Measuring units and worktop without allowing for corners and tall units.
- Ordering before the first payment and before acceptance in writing.
When the kitchen is decided on WhatsApp
The client sends photos of kitchens they like, changes their mind about the worktop and confirms in a voice note. Clara reads those chats and logs each agreement with the original message; on Max it drafts the quote from the conversation and your prices, and flags an accepted quote that still hasn’t been billed. See the page for renovation contractors and the carpentry template.
Frequent questions
Are kitchen units quoted per linear metre?
It is the usual way and what clients understand. If there are special units (oven housing, larder), add them as separate lines per unit.
Should appliances go on a kitchen renovation quote?
Only if you supply them. If the client buys them, charge fitting per appliance and note that the warranty is with their retailer.
How do I quote two worktop options?
Keep the likelier one in the quote and add the other as an alternative in the notes, with its price per metre. The client chooses without you redoing the PDF.
How much should I ask for when a kitchen job is accepted?
Enough to order the units without fronting the money yourself. Write the percentage and payment stages in the notes.
What if the old kitchen hides a pipe in poor condition?
Warn in the notes that it can happen and, if it does, send a new line with its price before you touch it.
Should the quote say how long the client will be without a kitchen?
Yes. It matters most to a household and saves calls during the job. Put it next to the total duration.